MRP Controller – Instrument Job – Qatar...
The position is responsible to perform the following: • Maintaining stock of material needed for maintenance of the plants. • Maintain stock level at an economically acceptable optimum level by analyzing historical usage, change in lead times, identify spare parts interchangeability and change in use patterns • Analyze spare parts usage and recommend changes of MRP data • Material requirement planning & control • Forecast material requirements based on MRP Run in ERP system and analyze accuracy of Master Data in replenishment suggestion • Recommend changes to inventory levels based on supply/demand analysis.